Post-Construction Cleanup in Kenosha & Racine
Construction dust settles back down for days, so a single wipe-through is never enough. We work from the highest surfaces downward, take the residue off fixtures, glass and tracks, and clean the floors last. Where trades are still finishing, we schedule a second pass once they are out.

What This Includes
Every job is scoped to your building and your schedule. This is what a post-construction cleanup visit covers.
- Fine dust removed from high surfaces down
- Paint, adhesive and sticker residue
- Windows, sills and door tracks
- Fixtures, vents and switch plates
- Floors cleaned last, once dust has settled
- Second pass available after final trades
100% natural products and professional grade chemicals, matched to the job, on commercial contracts and in homes alike. Jessica quotes the work, agrees the cleaning list with you and is the person to call when something needs to change. No call center, no franchise office.
Construction Dust Comes Back Down
The mistake on a handover clean is treating it like a very dirty regular clean. Fine dust stays airborne for days and keeps settling, so a single wipe-through looks perfect at 4pm and hazy the next morning. The order of work is what makes the difference.
Top down, floors last
High surfaces, ledges, vents and fixtures come first, then the middle of the room, then the floors once everything above has been cleared and the air has settled. Cleaning floors early just means cleaning them twice.
The residue trades leave behind
Paint spots, adhesive, sticker residue on glass and fittings, and the dust that packs into window tracks and door frames. These are the things a walkthrough catches and a fast clean misses, and they are the reason handovers get pushed.
A second pass when trades are still finishing
If joiners or decorators are still in and out, Jessica will schedule a second pass once they are genuinely done rather than pretending one visit will hold. That is agreed up front so it is in the quote, not a surprise afterwards.
New hard floors usually want a proper finish laid down once the site is clear. If the building then needs looking after, that is janitorial maintenance, and a finished home handover is residential cleaning.
